BMP- Index of Illustrations and Tables Index of Illustrations and Tables

Term Search:
(Unimplemented)

This form will allow you to search by term for illustrations and tables.

Search for term:

In: Illustrations Tables All

For The Year:



Project Work For The Year: 1989
Go to Tables for 1989 BMP

Figure 1
Schematic layout of test field (NW 1/4 Sec 29) illustrating 330 foot grid lines, field sector or quadrant boundaries and tile line locations.

Figure 2
Schematic illustrating location of transect lines (NW 1/4 Sec 29), and approximate locations of groundwater observation wells and disturbed soil profile lysimeters.

Figure 3
Typical Nested Well Installation, NW 29 Study Area, Oakes, North Dakota. Schematic illustrating relative position of nested groundwater observation wells.

Figure 4
Disturbed Lysimeter Layout, North West 29 BMP Project. Cross-section of a disturbed soil profile lysimeter installation.

Figure 5
Disturbed Lysimeter Construction Diagram, North West 29 BMP Project. Construction diagram for disturbed soil profile lysimeter.

Figure 6
Manhole Construction Diagram, North West 20 BMP Project. Construction diagram for manhole associated with a disturbed soil profile lysimeter.

Figure 7
Manhole Cover Construction Diagram, North West 29 BMP Project. Construction diagram of cover for manhole associated with disturbed soil profile lysimeter.

Figure 8
Manhole Tie Down Straps, North West 29 BMP Project. Diagram of tie-down straps that were used to anchor manhole unit to a concrete base.

Figure 9
Best Management Practices Quarter Section. Schematic layout of the test field including tile drain manholes, OBS wells, undisturbed lysimeters, disturbed lysimeters, and office/storage shack.

Figure 10
Undisturbed Lysimeter Unit and Expanded Side View of the Drainage Instrumentation. Schematic of the soil profile in a undisturved lysimeter.

Figure 11
External View of Instrumented PVC Shell, North WEst 29 BMP Project. Schematic of undisturbed lysimeter shell illustrating TDR wiring and vacuum line placement.

Figure 12
Cross Sectional View of a Undisturbed Lysimeter, North West 29 BMP Project. Cross sectional view of an undisturbed lysimeter illustrating relative location of instrumentation.

Figure 13
Lysimeter Base Assembly, North WEst 29 BMP Project. Schematic of the undisturbed lysimeter base assembly illustrating instrumentation installation.

Figure 14
Bar Ceramic Candle Systems, North West BMP Project. Schematic illustrating the main and backup ceramic candle systems.

Figure 15
Half-Shell Construction, North West 29 BMP Project. Schematic of PVC half-shell construction.

Figure 16
Location of Disturbed Lysimeter No. LNW, North West 29 BMP Project.

Figure 17
Location of Disturbed Lysimeter No. LNE, North West 29 BMP Project.

Figure 18
Location of Disturbed Lysimeter No. LSE, North West 29 BMP Project.

Figure 19
Location of Disturbed Lysimeter No. LSW, North West 29 BMP Project.

Figure 20
Location of Undisturbed Lysimeter No. L01, North West 29 BMP Project.

Figure 21
Location of Undisturbed Lysimeter No. L02, North West 29 BMP Project.

Figure 22
Location of Undisturbed Lysimeter No. L03, North West 29 BMP Project.

Figure 23
Location of Undisturbed Lysimeter No. L04, North West 29 BMP Project.

Figure 24
Location of Undisturbed Lysimeter No. L05, North West 29 BMP Project.

Figure 25
Location of Undisturbed Lysimeter No. L06, North West 29 BMP Project.

Figure 26
Location of Undisturbed Lysimeter No. L07, North West 29 BMP Project.

Figure 27
Location of Undisturbed Lysimeter No. L08, North West 29 BMP Project.

Figure 28
Location of Undisturbed Lysimeter No. L09, North West 29 BMP Project.

Figure 29
Location of Undisturbed Lysimeter No. L10, North West 29 BMP Project.

Figure 30
Location of Undisturbed Lysimeter No. L11, North West 29 BMP Project.

Figure 31
Location of Undisturbed Lysimeter No. L12, North West 29 BMP Project.

Figure 32
Location of Undisturbed Lysimeter No. L13, North West 29 BMP Project.

Figure 33
Location of Undisturbed Lysimeter No. L14, North West 29 BMP Project.

Figure 34
Location of Undisturbed Lysimeter No. L15, North West 29 BMP Project.

Figure 35
Location of Undisturbed Lysimeter No. L16, North West 29 BMP Project.

Figure 36
Location of Undisturbed Lysimeter No. L17, North West 29 BMP Project.

Figure 37
Location of Undisturbed Lysimeter No. L18, North West 29 BMP Project.

Figure 38
Location of Undisturbed Lysimeter No. L19, North West 29 BMP Project.

Figure 39
Location of Undisturbed Lysimeter No. L20, North West 29 BMP Project.


Go to Illustrations for 1989 BMP

Table 1
Bill of materials for construction of individual disturbed lysimeter and manhole assembly.

Table 2
Bulk density comparisons for disturbed lysimeter installations.

Table 3
Summary of compaction measurements for undisturbed lysimeters at the Oakes Test Area Best Managment Practices field study.

Table 4
Bulk densities of the soil profile for the undisturbed lysimeters at time of construction.


Page Information