BMP- Index of Illustrations and Tables
Index of Illustrations and Tables
Term Search:
(Unimplemented)
This form will allow you to search by term for illustrations and tables.
Project Work For The Year: 1989
Go to Tables for 1989 BMP
- Figure 1
- Schematic layout of test field (NW 1/4 Sec 29) illustrating 330 foot grid lines, field sector or quadrant boundaries and tile line locations.
- Figure 2
- Schematic illustrating location of transect lines (NW 1/4 Sec 29), and approximate locations of groundwater observation wells and disturbed soil profile lysimeters.
- Figure 3
- Typical Nested Well Installation, NW 29 Study Area, Oakes, North Dakota. Schematic illustrating relative position of nested groundwater observation wells.
- Figure 4
- Disturbed Lysimeter Layout, North West 29 BMP Project. Cross-section of a disturbed soil profile lysimeter installation.
- Figure 5
- Disturbed Lysimeter Construction Diagram, North West 29 BMP Project. Construction diagram for disturbed soil profile lysimeter.
- Figure 6
- Manhole Construction Diagram, North West 20 BMP Project. Construction diagram for manhole associated with a disturbed soil profile lysimeter.
- Figure 7
- Manhole Cover Construction Diagram, North West 29 BMP Project. Construction diagram of cover for manhole associated with disturbed soil profile lysimeter.
- Figure 8
- Manhole Tie Down Straps, North West 29 BMP Project. Diagram of tie-down straps that were used to anchor manhole unit to a concrete base.
- Figure 9
- Best Management Practices Quarter Section. Schematic layout of the test field including tile drain manholes, OBS wells, undisturbed lysimeters, disturbed lysimeters, and office/storage shack.
- Figure 10
- Undisturbed Lysimeter Unit and Expanded Side View of the Drainage Instrumentation. Schematic of the soil profile in a undisturved lysimeter.
- Figure 11
- External View of Instrumented PVC Shell, North WEst 29 BMP Project. Schematic of undisturbed lysimeter shell illustrating TDR wiring and vacuum line placement.
- Figure 12
- Cross Sectional View of a Undisturbed Lysimeter, North West 29 BMP Project. Cross sectional view of an undisturbed lysimeter illustrating relative location of instrumentation.
- Figure 13
- Lysimeter Base Assembly, North WEst 29 BMP Project. Schematic of the undisturbed lysimeter base assembly illustrating instrumentation installation.
- Figure 14
- Bar Ceramic Candle Systems, North West BMP Project. Schematic illustrating the main and backup ceramic candle systems.
- Figure 15
- Half-Shell Construction, North West 29 BMP Project. Schematic of PVC half-shell construction.
- Figure 16
- Location of Disturbed Lysimeter No. LNW, North West 29 BMP Project.
- Figure 17
- Location of Disturbed Lysimeter No. LNE, North West 29 BMP Project.
- Figure 18
- Location of Disturbed Lysimeter No. LSE, North West 29 BMP Project.
- Figure 19
- Location of Disturbed Lysimeter No. LSW, North West 29 BMP Project.
- Figure 20
- Location of Undisturbed Lysimeter No. L01, North West 29 BMP Project.
- Figure 21
- Location of Undisturbed Lysimeter No. L02, North West 29 BMP Project.
- Figure 22
- Location of Undisturbed Lysimeter No. L03, North West 29 BMP Project.
- Figure 23
- Location of Undisturbed Lysimeter No. L04, North West 29 BMP Project.
- Figure 24
- Location of Undisturbed Lysimeter No. L05, North West 29 BMP Project.
- Figure 25
- Location of Undisturbed Lysimeter No. L06, North West 29 BMP Project.
- Figure 26
- Location of Undisturbed Lysimeter No. L07, North West 29 BMP Project.
- Figure 27
- Location of Undisturbed Lysimeter No. L08, North West 29 BMP Project.
- Figure 28
- Location of Undisturbed Lysimeter No. L09, North West 29 BMP Project.
- Figure 29
- Location of Undisturbed Lysimeter No. L10, North West 29 BMP Project.
- Figure 30
- Location of Undisturbed Lysimeter No. L11, North West 29 BMP Project.
- Figure 31
- Location of Undisturbed Lysimeter No. L12, North West 29 BMP Project.
- Figure 32
- Location of Undisturbed Lysimeter No. L13, North West 29 BMP Project.
- Figure 33
- Location of Undisturbed Lysimeter No. L14, North West 29 BMP Project.
- Figure 34
- Location of Undisturbed Lysimeter No. L15, North West 29 BMP Project.
- Figure 35
- Location of Undisturbed Lysimeter No. L16, North West 29 BMP Project.
- Figure 36
- Location of Undisturbed Lysimeter No. L17, North West 29 BMP Project.
- Figure 37
- Location of Undisturbed Lysimeter No. L18, North West 29 BMP Project.
- Figure 38
- Location of Undisturbed Lysimeter No. L19, North West 29 BMP Project.
- Figure 39
- Location of Undisturbed Lysimeter No. L20, North West 29 BMP Project.
Go to Illustrations for 1989 BMP
- Table 1
- Bill of materials for construction of individual disturbed lysimeter and manhole assembly.
- Table 2
- Bulk density comparisons for disturbed lysimeter installations.
- Table 3
- Summary of compaction measurements for undisturbed lysimeters at the Oakes Test Area Best Managment Practices field study.
- Table 4
- Bulk densities of the soil profile for the undisturbed lysimeters at time of construction.
Page Information