Construction Overview
  • BMP Home Page
  • NDSU Dept. Soil Science Home Page
  • BMP Slide Index Button


    Construction Overview

    Please Note: We have a great deal of information to provide through these pages. Images will be updated, organized, reorganized, and appropriate notations added on a regular basis.

  • Slides 1 thru 24:   Construction and Installation of Undisturbed Lysimeters
  • Slides 25 thru 39:   Construction and Installation of Disturbed Lysimeters

    You may view any of the "slides" by selecting from the images below.


    PVC Sleeve in Cutting Bit Attaching Cutting Bit to Pile Driver Driving Cutting Bit

    Excavating Around Cutting Bit Excavating Around Bit Cutting Off Soil Column

    Preparing To Lift Sleeve and Soil Core Removing Steel Sleeve Inverting Core for Instrumentation

    Link to Next Page


    Page Information